Welcome to TlMO Construction Engineering Co, Ltd.

Floor Project of Western Hydrogen Energy Industrial Park

2025-07-21 Visits:

Floor Project of Western Hydrogen Energy Industrial Park

4mm water-based polyurethane mortar self leveling+super wear-resistant cover surface

Product model: SH-JAZ-101+LY-CNM-122

Construction process: Plain shot blasting - Cutting anchor groove - Bottom layer construction (3kg/㎡) - Surface layer construction (5kg/㎡) - Super wear-resistant cover surface (0.1kg/㎡)

Product features:

Low VOC volatilization, clean and environmentally friendly taste

Super strong adhesion, no discoloration or peeling when soaked in water

• Resistant to high and low temperatures, cold and hot cycles, and short-term thermal shock

• Corrosion resistant to oil, salt, seasonings, detergents, acid and alkali, etc

6H hardness, resistant to heavy pressure, impact, and wear

• Non permeable, does not breed bacterial growth

• Anti slip, avoid water accumulation

• Resistant to yellowing and easy to clean


Scope of application: Suitable for use in pharmaceutical factories, chemical factories, low-temperature cold storage, food processing factories, dairy factories, breweries, and extreme industrial environments with heavy loads and strong impacts


微信图片_20250716155550.jpg

微信图片_20250716155600.jpg

微信图片_20250716155604.jpg

微信图片_20250716155608.jpg

微信图片_20250716155612.jpg

微信图片_20250716155616.jpg

微信图片_20250716155620.jpg

微信图片_20250716155624.jpg

微信图片_20250716155628.jpg

微信图片_20250716155632.jpg


Leave Your Message


Leave Your Message